Contact Information
Basin Study Reports
Contact Jorge Jimenez, P.E., at jjimenez@seminolecountyfl.gov or (407) 665-5753 for questions about the Basin Study Reports.
Report Descriptions | |
---|---|
To Save these files to your computer: First, click on one of the links below. Then, after the list of available reports appears, right-click on the desired documents and choose "Download". | |
Aloma Woods Drainage Basin StudyPrepared by: Professional Engineering Consultants Inc.July 2004 | |
Aloma Woods Outfall AssessmentPrepared by: Inwood Consulting EngineersJune 2010 | |
Big Wekiva Basin Study and Drainage InventoryPrepared by: Dyer, Riddle, Mills & Precourt, Inc.September, 2000 | |
Cassel Creek ProjectsPrepared by: BCI Engineers & Scientists, Inc.June 2005 | |
Feasibility Study of Waste Tire Use in Pollution Control for Stormwater Management and Water Conservation in FloridaPrepared by: Stormwater Management Academy, University of Central Florida.September 2008 | |
Gee Creek BasinPrepared by: Singhofen & Associates, IncDecember 1996 | |
Grace Lake Basin StudyPrepared by: Pegasus Engineering.March 28, 2014 | |
Howell Creek Assessment-Lake Howell Rd to SR 436Prepared by: Inwood Consulting Engineers.February 2010 | |
Howell Creek Basin Drainage Inventory Engineering StudyPrepared by: Dyer, Riddle, Mills & Precourt, Inc.February 1994 adICPR ver. 1.4 | |
Howell Creek Basin Water Management PlanPrepared by: Camp, Dresser and McKee, Inc. | |
Howell Creek Basin Water Management StudyPlan Part I : System InventoryPlan Part II : Engineering Analysis Prepared by: Camp, Dresser and McKee, Inc. May 2007 | |
Lake Harney Basin StudyPrepared by: GeosyntecApril 2021 | |
Lake Jesup Basin Engineering Study and Drainage InventoryPrepared by: Camp, Dresser & McKee Inc.December 2001 | |
Little Econlockhatchee River BasinPrepared by: Singhofen & Associates, IncMay 2001 | |
Little Lake Howell BasinPrepared by: Gee and JensonMay 1997 | |
Little Wekiva BasinPrepared by: Camp, Dresser & McKee, Inc.November 2005 | |
Lockhart-Smith Canal, Monroe Basin Engineering Study and Drainage InventoryPrepared by: Singhofen & Associates, Inc.September 1992 | |
Midway BasinPrepared by: Lochrane Engineering, Inc.September 1997 | |
Midway Basin StudyPrepared by: CDM SmithMay 2021 | |
Mill Creek - Cloud Branch Drainage Study, City of Sanford, FloridaPrepared by: Conklin, Porter & Holmes Engineers, Inc.April 1988 | |
Monroe Basin Engineering StudyPrepared by: Camp, Dresser & McKee Inc.February 2002 adlCPR ver. 2.20 | |
Mullet Lake Park RoadPrepared by: Inwood Consulting Engineers. March 2006 | |
Seminole County Stormwater Master PlanPrepared by: CH2MHill IncApril 2018 | |
Soldier's Creek BasinPrepared by: Singhofen & Associates, IncDecember 1996 | |
Summary Memorandum Snow Hill Road-Jacobs Trail Outfall Improvement ProjectPrepared by: Singhofen & Associates, Inc.September 9, 2008 | |
Summary Preliminary Engineering Report for Stormwater Management Facilites Mill Creek - Cloud Branch, City of Sanford, FloridaPrepared by: Conklin, Porter & Holmes Engineers, Inc.July 1992 | |
Wekiva Parkway & Protection ActPrepared by: Camp, Dresser & McKee, Inc.November 2005 |