Engineering Division

Basin Study Reports

PDfYou need to have a free version of Acrobat Reader installed on your computer in order to read and print PDFs.

Contact Mike Garcia at (407) 665-5673 for questions about the Basin Study Reports.

Report Descriptions

To Save these files to your computer: First, click on one of the links below.
Then, after the list of available reports appears, right-click on the desired documents and choose "Download".

Grace Lake Basin Study

Prepared by: Pegasus Engineering.
March 28, 2014

Lockhart-Smith Canal, Monroe Basin Engineering Study and Drainage Inventory

Modeling Data

Final Report

Prepared by: Singhofen & Associates, Inc.
September 1992

Feasibility Study of Waste Tire Use in Pollution Control for Stormwater Management and Water Conservation in Florida

Prepared by: Stormwater Management Academy, University of Central Florida.
September 2008

Summary Memorandum Snow Hill Road-Jacobs Trail Outfall Improvement Project

Prepared by: Singhofen & Associates, Inc.
September 9, 2008

Wekiva Parkway & Protection Act

Prepared by: Camp, Dresser & McKee, Inc.
November 2005

Big Wekiva Basin Study and Drainage Inventory

Phase 1

Phase 2

Final Report - Appendices

Prepared by: Dyer, Riddle, Mills & Precourt, Inc.
September, 2000

Monroe Basin Engineering Study

Report

ICPR 2yr

ICPR 10yr

ICPR 25yr

ICPR 50yr

ICPR 100yr

Model

Prepared by: Camp, Dresser & McKee Inc.
February 2002
adlCPR ver. 2.20

Lake Jesup Basin Engineering Study and Drainage Inventory

Report

ICPR 10yr

ICPR 25yr

ICPR 100yr

Model

Prepared by: Camp, Dresser & McKee Inc.
December 2001

Little Econlockhatchee River Basin

Report

Arcview

Contents

Drawings

Existing ICPR 1

Existing ICPR 2

Future ICPR 3

Future ICPR 4

Prepared by: Singhofen & Associates, Inc
May 2001

Midway Basin

Prepared by: Lochrane Engineering, Inc.
September 1997

Little Lake Howell Basin

Prepared by: Gee and Jenson
May 1997

Soldier's Creek Basin

Prepared by: Singhofen & Associates, Inc
December 1996

Gee Creek Basin

Prepared by: Singhofen & Associates, Inc
December 1996

Little Wekiva Basin

Prepared by: Camp, Dresser & McKee, Inc.
November 2005

Howell Creek Basin Water Management Plan

Modeling Data

Final Report

Final Report - Appendices

Prepared by: Camp, Dresser and McKee, Inc.
April 2011

Howell Creek Basin Water Management

Plan Part I : System Inventory
Plan Part II : Engineering Analysis
Prepared by: Camp, Dresser and McKee, Inc. May 2007

Howell Creek Basin Drainage Inventory Engineering Study

Prepared by: Dyer, Riddle, Mills & Precourt, Inc.
February 1994
adICPR ver. 1.4

Howell Creek Assessment-Lake Howell Rd to SR 436

Prepared by: Inwood Consulting Engineers.
February 2010

Cassel Creek Projects

Prepared by: BCI Engineers & Scientists, Inc.
June 2005

Aloma Woods Drainage Basin Study

Prepared by: Professional Engineering Consultants Inc.
July 2004

Aloma Woods Outfall Assessment

Prepared by: Inwood Consulting Engineers
June 2010

Summary Preliminary Engineering Report for Storemwater Management Facilites Mill Creek - Cloud Branch City of Sanford, Florida

Prepared by: Conklin, Porter & Holmes Engineers, Inc.
July 1992

Stormwater Management Study

Prepared by: Post, Buckley, Schuh & Jernigan Inc
June 1989

Mill Creek - Cloud Branch Drainage Study, City of Sanford, Florida

Prepared by: Conklin, Porter & Holmes Engineers, Inc.
April 1988

Mullet Lake Park Road

Project Status

Technical Memorandum

Prepared by: Inwood Consulting Engineers.
March 2006