Contact Information

Loading...

Sewer Connection Inspection Request

Sewer Connection Inspection requires a 72 hour advanced notice Monday through Thursday and between the hours of 8:00 AM and 2:00 PM or Fridays between 8:00 AM and 12:00 PM.

County Inspector
Connection to
Inspection Date Requested
Contractor's Responsibilities
  1. Install dewatering, sheeting, bracing or shoring (if required).
  2. Coring the hole in the manhole or lift station.
  3. Lining of manhole if force main connection is made.
  4. Re-working the existing invert to accept new inflow.
  5. Lift station liner repair after invert connection.
  6. Backfilling & compaction of excavated area.
  7. Restoration as required.