TRAFFIC
ENGINEERING
Maintenance
of Traffic

Jack & Bore,
Directional, Lane Closure, Road Closure,
and Right of Way use
This page was updated on 2/17/2009.
Maintenance
of Traffic Proposal Form (PDF) [41KB]
Current
Projects
Central Florida Environmental (CFE Corp) Project name: CR 427 sidewalks from General Hutchinson Pkwy to Country Club Road.
Location: CR 427 from General Huchinson Pkwy to Country Club Road.
Start at General Hutchinson Pky, grade for sidewalk, pour sidewalk, grade/sod and clean up.
Proposed construction date: January 29, 2009
Duration of construction: April 29, 2009Expertech Network Installation Project name: Markham Woods Road Utilities Phase 2
Location: Markham Woods Road (Michigan to Fieldwood) and (Markham Road to Timberbrook)
Lay pipe, driveway demo and replacement and jack & bores.
Proposed construction date: June 17, 2008
Duration of construction: May 1, 2009PCPI Service Project name: Lockwood - Carrillon sidewalk cleaning
Location: Lockwood Blvd.
Pressure cleaning curb, gutter and concrete curb on median. Pressure clean the sidewalks.
Proposed construction date: February 16, 2009
Duration of construction: March 16, 2009Southern Site Works Inc. Project name: Orange Blvd Utility Improvements
Location: Orange Blvd from SR 46 to CR 46A
Installation of water force main and reuse lines within right of way and widening of Orange Blvd.
Proposed construction date: May 2008
Duration of construction: October 2009
|
|
|
RESOURCES
|
|
|
CONTACT INFORMATION
Traffic Engineering
140 Bush Loop
Sanford, FL 32773
View Map
Phone: (407) 665-5677
Public Works
520 West Lake Mary Blvd
Suite 200
Sanford, FL 32773
View Map
Phone: (407) 665-5601
E-mail
|
|
|
|
|
|