PROJECT ID |
|
|
SR 46 AND SR 415 E LAKE MARY BLVD INTERSECTION IMPROVEMENTS
Project Type: Roadway Projects
Project Manager:
Shad Smith - 407-665-5707
Status: Active
From: 250` SOUTH ON E. LAKE MARY BLVD.
To: 700` NORTH OF KLONDIKE WAY
Scope: THIS PROJECT WILL ADD ADDITIONAL NB AND SB THROUGH LANES AT THE INTERSECTION. THE INTERSECTION IS EXPERIENCING OPERATIONAL DELAYS DUE TO THE ADDITION OF THE EAST LAKE MARY BLVD EXTENSION TO THE SOUTH AND DUE TO NEW DEVELOPMENTS IN THE AREA.
Phases:
Design Start: 4/2009 End: 12/2009
|
|
SR 46 GATEWAY SIDEWALK LOCAL AGENCY PROGRAM
Project Type: Sidewalk Projects
Project Manager:
David Martin - 407-665-5610
Status: Active
From: RINEHART RD
To: AIRPORT BLVD
Scope: DESIGN AND CONSTRUCT SIDEWALKS ALONG 2.0 MILES OF SR 46 IN SANFORD. INCLUDES 10 FOOT SIDEWALK ALONG NORTH SIDE OF SR 46 AND 5 FOOT SIDEWALK ALONG SOUTH SIDE. ADDITIONAL RIGHT OF WAY OR EASEMENTS WILL NEED TO BE ACQUIRED THROUGH DONATION TO AND MAINTAINED BY THE CITY OF SANFORD. THIS WILL BE APPROXIMATELY 10,316 LINEAR FEET OF SIDEWALKS. THIS IS A FLORIDA DEPARTMENT OF TRANSPORTATION LOCAL AGENCY PROGRAM PROJECT WITH REIMBURSEMENT FOR DESIGN AND CONSTRUCTION.
FLORIDA DEPARTMENT OF TRANSPORTATION AGREEMENT # AO857
FLORIDA DEPARTMENT OF TRANSPORTATION
ADDITIONAL ANTICIPATED AGREEMENT
Phases:
Design Start: 2/2008 End: 12/2009 Road Construction Start: 11/2009 End: 6/2010
|
|
SR 46 NEW FIBER OPTIC CONSTRUCTION
Project Type: Traffic
Project Manager:
Charles Wetzel III - 407-665-5686
Status: Active
From: US 17-92
To: MELLONVILLE
Scope: INSTALLATION OF NEW FIBER FOR INCREASED CAPACITY AND REDUNDANCY.
Phases:
Road Construction Start: 2/2009 End: 9/2009
|
|
ST JOHNS RIVER BASIN - MULLET LAKE PARK ROAD RSF PROJECT
Project Type: Stormwater
Project Manager:
Mark Flomerfelt - 407-665-5709
Status: Active
Scope: PROJECT IS A REGIONAL STORMWATER FACILITY (RSF) TO REMOVE PHOSPHORUS AND NITROGEN FROM THE ST JOHNS RIVER BASIN.
Phases:
Design Start: 10/2012 End: 9/2013 Land Start: 10/2013 End: 9/2014 Construction Start: 10/2014 End: 9/2015
|
|
STILLWATER DR AT STILLWATER SUBDIVISION RETROFIT
Project Type: Stormwater
Project Manager:
Mark Flomerfelt - 407-665-5709
Status: Active
From: SR 434
To: BROWARD CT
Scope: ENGINEERING DESIGN AND CAMERA INSPECTION FOR STILLWATER SUBDIVISION FROM SR 434 TO BROWARD CT.
Phases:
Design Start: 3/2009 End: 9/2010
|
|
SWEETWATER COVE TRIBUTARY DREDGING AND DRAINAGE IMPROVEMENTS
Project Type: Stormwater
Project Manager:
Robert Walter - 407-665-5753
Status: Active
From: WEKIVA SPRINGS RD
To: WEKIVA RIVER
Scope: SEDIMENT DREDGING OF SWEETWATER COVE ALONG WITH STRUCTURE MODIFICATIONS AND LITTORAL PLANTING. (WETLAND PLANTS AROUND THE EDGE OF A LAKE)
ST JOHNS RIVER WATER MANAGEMENT DISTRICT
AGREEMENT # SE621AA
Phases:
Design Start: 3/2006 End: 3/2008 Construction Start: 3/2009 End: 12/2009
|
|
SYLVAN LAKE OUTFALL LAKE LEVEL CONTROL
Project Type: Stormwater
Project Manager:
Robert Walter - 407-665-5753
Status: Active
From: LAKE SYLVAN
To: WEKIVA RIVER
Scope: LAKE LEVEL CONTROL CONSISTING OF SURFACE WATER MODIFICATIONS AND IRRIGATION FROM THE LAKE
Phases:
Construction Start: 10/2007 End: 5/2011
|
|
US 17-92 AT BUTTON RD MAST ARMS
Project Type: Traffic
Project Manager:
Charles Wetzel III - 407-665-5686
Status: Active
From: N/A
To: N/A
Scope: CONVERSION OF AN EXISTING SPAN WIRE SIGNAL TO MAST ARMS.
Phases:
Road Construction Start: 2/2008 End: 9/2009
|
|
US 17-92 AT SEMINOLA BLVD AND DOG TRACK MAST ARMS
Project Type: Traffic
Project Manager:
Charles Wetzel III - 407-665-5686
Status: Active
From: N/A
To: N/A
Scope: CONVERSION OF AN EXISTING SPAN WIRE SIGNAL TO MAST ARMS.
Phases:
Road Construction Start: 2/2008 End: 9/2009
|
|
US 17-92 LAKEFRONT RIVERWALK CITY OF SANFORD LEAD
Project Type: Roadway Projects
Project Manager:
David Martin - 407-665-5610
Status: Active
From: FULTON RD
To: I-4
Scope: CITY OF SANFORD PROJECT
Phases:
Road Construction Start: - End: -
|
|
W 27TH ST SIDEWALK
Project Type: Sidewalk Projects
Project Manager:
David Andrews, Jr. - 407-665-5716
Status: Active
From: US 17-92
To: SANFORD AVE
Scope: CONSTRUCT 3,000 LINEAR FEET OF SIDEWALK ON NORTH SIDE OF W 27TH ST FROM US 17-92 TO SANFORD AVE
Phases:
Design Start: 4/2008 End: 5/2009 Land Start: 10/2008 End: 9/2009 Construction Start: 10/2009 End: 12/2009
|
|
W CRYSTAL DR DRAINAGE IMPROVEMENTS
Project Type: Stormwater
Project Manager:
Mark Flomerfelt - 407-665-5709
Status: Active
From: COUNTRY CLUB RD
To: LAKE BLVD
Scope: MISCELLANEOUS ROADWAY DRAINAGE IMPROVEMENTS ALONG WITH WATER QUALITY RETROFIT FOR THE AREA.
Phases:
Design Start: 1/2009 End: 12/2009 Construction Start: - End: -
|
|
W LAKE MARY BLVD AND LAKE EMMA RD INTERSECTION IMPROVEMENTS
Project Type: Roadway Projects
Project Manager:
Status: Active
From: INTERSECTION
To: INTERSECTION
Scope: ADDITION OF A 2ND EASTBOUND RIGHT TURN LANE.
Phases:
Construction Start: 10/2009 End: 9/2010
|
|
WEKIVA PARK DR OUTFALL IMPROVEMENTS
Project Type: Stormwater
Project Manager:
Rolando Raymundo - 407-665-5715
Status: Active
From: SR 46
To: END OF ROAD
Scope: REPLACEMENT AND UPSIZING OF SEVERAL CROSSDRAINS INTO THE WEKIVA RIVER
Phases:
Design Start: 9/2005 End: 10/2008 Land Start: 6/2005 End: 11/2009 Construction Start: 12/2008 End: 8/2009
|
|
WEKIVA TRL AT WEKIVA CLUB SUBDIVISION RETROFIT
Project Type: Stormwater
Project Manager:
Mark Flomerfelt - 407-665-5709
Status: Active
From: HUNT CLUB BLVD
To: HUNT CLUB BLVD
Scope: PIPELINING FOR WEKIVA CLUB SUBDIVISION FROM HUNT CLUB BLVD TO HUNT CLUB BLVD.
Phases:
Construction Start: 12/2007 End: 9/2009
|
|
WHISPERING WINDS POND RETROFITS
Project Type: Stormwater
Project Manager:
Kimberly Ornberg - 407-665-5738
Status: Monitoring
From: NA
To: NA
Scope: THE PURPOSE OF THIS PROJECT IS TO REPAIR/RECONSTRUCT TO 3 PONDS LOCATED WITHIN THE WHISPERING WINDS SUBDIVISION, WHICH DRAIN TO THE LITTLE WEKIVA RIVER (AN DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL MAXIMUM DAILY LOAD IMPAIRED WATERBODY). THE PROPOSED RETROFITS WILL BRING THE PONDS INTO PERMIT COMPLIANCE WITH ST JOHNS RIVER WATER MANAGMENT DISTRICT. , AS WELL AS INCREASE THE WATER QUALITY TREATMENT CURRENTLY PROVIDED BY THE PONDS (THUS PROVIDING TOTAL MAXIMUM DAILY LOAD WATER QUALITY CREDITS FOR THE LITTLE WEKIVA BASIN).
Phases:
Construction Start: - End: -
|
|
WIRZ PARK TRL CITY OF CASSELBERRY LEAD
Project Type: Trail Projects
Project Manager:
David Martin - 407-665-5610
Status: Active
From: KEWANNEE PARK
To: WIRZ PARK
Scope: REIMBURSEMENT/FRONTING OF FUNDS FOR DESIGN AND CONSTRUCTION OF A 1.6 MILE SECTION OF 10-FOOT WIDE TRAIL.
Phases:
Construction Start: 10/2007 End: 9/2010
|
|
WYMORE RD ADD CENTER LANE
Project Type: Roadway Projects
Project Manager:
Shad Smith - 407-665-5707
Status: Active
From: ORANGE COUNTY LINE
To: SR 436
Scope: THIS PROJECT CONSISTS OF RECONSTRUCTING THE EXISTING TWO LANE ROAD. THE RECONSTRUCTION WILL WIDEN THE ROADWAY FROM ITS CURRENT TWO LANES BY ADDING A CENTER MEDIAN WITH TURN LANES AND OTHER SAFETY AND DRAINAGE IMPROVEMENTS. THE PROJECT LENGTH IS 1.3 MILES
Phases:
Design Start: 7/2004 End: 11/2008 Land Start: 10/2004 End: 9/2013 Road Construction Start: 11/2013 End: 8/2015
|
|
WYMORE RD AND ORANOLE INTERSECTION IMPROVEMENTS
Project Type: Roadway Projects
Project Manager:
Status: Active
From: INTERSECTION
To: INTERSECTION
Scope: ADD EAST BOUND AND NORTH BOUND RIGHT TURN LANES TO THE INTERSECTION.
Phases:
Design Start: 10/2009 End: 9/2010 Road Construction Start: 10/2010 End: 9/2011
|
|
WYMORE RD SIDEWALK
Project Type: Sidewalk Projects
Project Manager:
Ken Mickenberg - 407-665-5714
Status: Active
From: SR 436
To: LAKE DESTINY RD
Scope: THE PROJECT WILL ADD APPROXIMATELY 1.3 MILES OF SIDEWALK THAT WILL NEED TO BE MAINTAINED BY THE PUBLIC WORKS/ROADS DIVISION.
Phases:
Design Start: 4/2009 End: 12/2009 Construction Start: 2/2010 End: 5/2010
|