PROJECT ID |
|
|
OSCEOLA RD. RESURFACING PROJECT
Project Type: Paving
Project Manager:
Mike Van Der Heyden - 407-665-5748
Status: Active
From: KIMMIE KAY DR (WEST INTERSECTION)
To: LANDFILL ENTRANCE
Scope: ASPHALT OVERLAY, FULL DEPTH RECLAMATION, AND VARIOUS METHODS OF ASPHALT SURFACE REFURBISHMENT THAT ARE APPLIED TO SEMINOLE COUNTY`S PAVED ROAD NETWORK. THIS INCLUDES LOCAL ROAD RESURFACING AND REHABILITATION THAT MAY INVOLVE RECONSTRUCTION ACTIVITY. THIS ALSO INCLUDES RESURFACING OF ARTERIAL/COLLECTOR ROADS NOT INVOLVING THE ROADWAY BASE.
Phases:
Road Construction Start: - End: -
|
|
OXFORD RD AT LAKE OF THE WOODS BLVD MAST ARMS
Project Type: Traffic
Project Manager:
Charles Wetzel III - 407-665-5686
Status: Active
From: N/A
To: N/A
Scope: CONVERSION OF AN EXISTING SPAN WIRE SIGNAL TO MAST ARMS.
Phases:
Road Construction Start: 2/2009 End: 8/2009
|
|
PALM SPRINGS RD AT NORTH ST MAST ARMS
Project Type: Traffic
Project Manager:
Charles Wetzel III - 407-665-5686
Status: Active
From: N/A
To: N/A
Scope: CONVERSION OF AN EXISTING SPAN WIRE SIGNAL TO MAST ARMS.
Phases:
Road Construction Start: 3/2009 End: 8/2009
|
|
PENFIELD CV AT MIDDLETON OAKS ASPHALT SURFACE AND PAVEMENT MANAGEMENT
Project Type: Paving
Project Manager:
Harry Raysin - 407-665-2839
Status: Active
From: MEETING PL
To: CUL DE SAC
Scope: ASPHALT OVERLAY, FULL DEPTH RECLAMATION, AND VARIOUS METHODS OF ASPHALT SURFACE REFURBISHMENT THAT ARE APPLIED TO SEMINOLE COUNTY’S PAVED ROAD NETWORK. THIS INCLUDES LOCAL ROAD RESURFACING AND REHABILITATION THAT MAY INVOLVE RECONSTRUCTION ACTIVITY. THIS ALSO INCLUDES RESURFACING OF ARTERIAL/COLLECTOR ROADS NOT INVOLVING THE ROADWAY BASE.
Phases:
Construction Start: 10/2009 End: 9/2010
|
|
RED BUG LAKE RD AT ELEMENTARY SCHOOL PEDESTRIAN OVERPASS
Project Type: Overpasses
Project Manager:
Antoine Khoury - 407-665-5768
Status: Active
From: N/A
To: N/A
Scope: DESIGN BUILD PEDESTRIAN OVERPASS
Phases:
Land Start: 9/2005 End: 12/2006 Construction Start: 1/2010 End: 8/2011
|
|
RED BUG LAKE RD AT HOWELL CREEK EROSION CONTROL
Project Type: Stormwater
Project Manager:
Robert Walter - 407-665-5753
Status: Active
From: TUSKAWILLA RD
To: RED BUG LAKE RD
Scope: EROSION CONTROL PROJECT UNDER RED BUG LAKE BRIDGE
Phases:
Design Start: 12/2008 End: 8/2010 Land Start: 2/2010 End: 9/2010 Construction Start: 11/2010 End: 1/2012
|
|
RED BUG LAKE RD DETECTABLE WARNINGS
Project Type: Traffic Safety
Project Manager:
Melonie Barrington - 407-665-5676
Status: Active
From: SR 436
To: SR 426
Scope: DETECTABLE WARNINGS. RECONSTRUCT 27 RAMPS AND INSTALL TRUNCATED DOMES ON A TOTAL OF 216 RAMPS FOR ADA COMPLIANCE.
Phases:
Road Construction Start: 5/2009 End: 9/2009
|
|
RED BUG LAKE RD OUTFALL DRAINAGE IMPROVEMENTS
Project Type: Stormwater
Project Manager:
Robert Walter - 407-665-5753
Status: Active
From: RED BUG LAKE RD
To: LAKE HOWELL
Scope: WATER QUALITY RETROFIT PROJECT ADDRESSING STORMWATER FROM RED BUG LAKE ROAD AND DEER RUN AREA. INCLUDES A WET RETENTION POND.
Phases:
Design Start: 1/2007 End: 10/2009 Construction Start: 12/2009 End: 10/2010
|
|
RIDGEWOOD ST AND ALPINE ST SIDEWALK
Project Type: Sidewalk Projects
Project Manager:
Eric Erickson - 407-665-5666
Status: Active
From: PALM SPRINGS DR
To: EVERGREEN AVE
Scope: THIS PROJECT WILL CONSTRUCT A NEW SIDEWALK ON RIDGEWOOD ST & ALPINE ST FROM PALM SPRINGS DR TO EVERGREEN AVE. THE TOTAL LENGTH OF THE NEW SIDEWALK IS APPROXIMATELY 4500 LINEAR FEET. 810 LF ON PALM SPRINGS DR HAS BEEN ADDED TO PROJECT.
FLORIDA DEPARTMENT OF TRANSPORTATION
ANTICIPATED AGREEMENT
Phases:
Design Start: 2/2008 End: 1/2009 Construction Start: 4/2010 End: 7/2010
|
|
RISING SUN BLVD AT SUNRISE SUBDIVISION RETROFIT
Project Type: Stormwater
Project Manager:
Mark Flomerfelt - 407-665-5709
Status: Active
From: RED BUG LAKE RD
To: MAPIMI CT
Scope: DESIGN AND PIPELING FOR SUNRISE SUBDIVISION FROM RED BUG LAKE RD TO MAPIMI CT.
Phases:
Design Start: - End: - Construction Start: 10/2009 End: 2/2010
|
|
S SANFORD AVE AT LAKE MARY BLVD MAST ARM AND TURN LANES
Project Type: Traffic
Project Manager:
Charles Wetzel III - 407-665-5686
Status: Active
From: N/A
To: N/A
Scope: THIS PROJECT WILL DESIGN AND CONSTRUCT A NEW WARRANTED MAST ARM SIGNAL. THIS IS A HIGH PRIORITY PROJECT.
Phases:
Design Start: 11/2007 End: 8/2008 Road Construction Start: 5/2009 End: 10/2009
|
|
S. CITRUS RD SIDEWALK
Project Type: Sidewalk Projects
Project Manager:
Brett Blackadar - 407-665-5702
Status: Active
From: RED BUG LAKE ROAD
To: RAINBOW ELEMENTARY SCHOOL
Scope: RELOCATE UTILITIES AND REBUILD SIDEWALK TO PROVIDE SAFER PEDESTRIAN ROUTE FOR RAINBOW ELEMENTARY STUDENTS
Phases:
Construction Start: 1/2010 End: 2/2010
|
|
SAND LAKE RD @ HUNT CLUB INTERSECTION IMPROVEMENTS
Project Type: Roadway Projects
Project Manager:
Brett Blackadar - 407-665-5702
Status: Active
From: SAND LAKE ROAD
To: HUNT CLUB INTERSECTION
Scope: THIS PROJECT CONSISTS OF EXTENDING THE LENGTH OF THE WESTBOUND RIGHT-TURN LANE AS WELL AS ADDING PEDESTIAN IMPROVMENTS TO THE INTERSECTION OF SAND LAKE RD AND HUNT CLUB BLVD.
Phases:
Design Start: 12/2009 End: 9/2010 Road Construction Start: - End: -
|
|
SEMINOLA BLVD AT WINTER PARK DR MAST ARMS
Project Type: Traffic
Project Manager:
Charles Wetzel III - 407-665-5686
Status: Active
From: N/A
To: N/A
Scope: CONVERSION OF AN EXISTING SPAN WIRE SIGNAL TO MAST ARMS.
Phases:
Road Construction Start: 10/2008 End: 9/2009
|
|
SHADOW CREEK CIR AT CREEK WOOD SUBDIVISION RETROFIT
Project Type: Stormwater
Project Manager:
Mark Flomerfelt - 407-665-5709
Status: Active
From: MCCULLOCH RD
To: MCCULLOCH RD
Scope: CONSTRUCTION FOR CREEK WOOD SUBDIVISION FROM MCCULLOCH RD TO MCCULLOCH RD.
Phases:
Construction Start: 12/2009 End: 2/2010
|
|
SNOWHILL RD OUTFALL JACOBS TRL ECONLOCKHATCHEE BASIN
Project Type: Stormwater
Project Manager:
Rolando Raymundo - 407-665-5715
Status: Active
From: SNOWHILL RD
To: LAKE CRESENT DR
Scope: RECONSTRUCTION OF DITCHES AND OUTFALL FROM SNOWHILL RD TO LAKE CRESENT. DURING CONSTRUCTION OF JACOBS TRAIL AND THROUGH NATURAL OCCURRENCES THE DITCHES ALONG JACOBS TRAIL HAVE BEEN ALTERED AND DITCH BLOCKS WERE RENDERED INEFFECTIVE. THE PROJECT WILL RESTORE THESE DITCHES AND OUTFALL TO THEIR ORIGINAL CONDITIONS.
Phases:
Design Start: 3/2008 End: 3/2010 Road Construction Start: 5/2010 End: 10/2010
|
|
SPRING VALLEY LOOP AT SPRING VALLEY FARMS SUBDIVISION RETROFIT
Project Type: Stormwater
Project Manager:
Mark Flomerfelt - 407-665-5709
Status: Active
From: SPRING VALLEY RD
To: SPRING VALLEY RD
Scope: DRAINAGE WORK FOR SPRING VALLEY FARMS SUBDIVISION FROM SPRING VALLEY RD TO SPRING VALLEY RD.
Phases:
Construction Start: 12/2009 End: 2/2010
|
|
SR 426 AT ALOMA WOODS CONVEYANCE IMPROVEMENTS
Project Type: Stormwater
Project Manager:
Rolando Raymundo - 407-665-5715
Status: Active
From: SR 426
To: BEAR GULLY CREEK
Scope: IMPROVEMENTS TO CONVEYANCE SYSTEM, INCLUDING UPSIZING PIPES AND POTENTIALLY CONSTRUCTING A POND FOR FLOOD ATTENUATION
Phases:
Design Start: 7/2004 End: 9/2010 Construction Start: 10/2010 End: 9/2011
|
|
SR 426 CR 419 OVIEDO COST SHARED
Project Type: Roadway Projects
Project Manager:
Brett Blackadar - 407-665-5702
Status: Active
From: PINE AVE
To: LOCKWOOD BLVD
Scope: THIS PROJECT WILL WIDEN SR 426 AND CR 419 FROM 2 TO 4 LANES AND WILL MAKE ADDITIONAL INTERSECTION IMPROVEMENTS.
FLORIDA DEPARTMENT OF TRANSPORTATION AGREEMENT # 415030-1-38-01
BCC DATE 01/09/07, ACTION # 36, FUNDING AGREEMENT
Phases:
Design Start: 10/2007 End: 3/2010 Land Start: 7/2013 End: 7/2013 Road Construction Start: 1/2016 End: 7/2017
|
|
SR 426 TURN LANES
Project Type: Roadway Projects
Project Manager:
Ken Mickenberg - 407-665-5714
Status: Active
From: TUSKAWILLA RD
To: SR 417
Scope: THIS PROJECT WILL CONVERT THE SOUTHBOUND THROUGH LANE ON TUSKAWILLA RD TO A LEFT THROUGH LANE AT THE SR 426 INTERSECTION. IN ADDITION, SR 426 WILL BE WIDENED FROM 4 LANE TO 6 LANES IN THIS SECTION. THE APPROXIMATE PROJECT LENGTH IS 0.4 MILES. THE SCOPE OF WORK ALSO INCLUDES SIGNAL RETIMING TO INTEGRATED ELECTRONIC CONTROLS OF THE REVAMPED INTERSECTION WITH OTHER INTERSECTIONS ALONG THE SR 426 CORRIDOR.
Phases:
Design Start: 2/2006 End: 12/2009 Road Construction Start: 1/2010 End: 6/2010
|
|
SR 434 INTERSECTION IMPROVEMENTS
Project Type: Roadway Projects
Project Manager:
Shad Smith - 407-665-5707
Status: Active
From: RANGELINE RD
To: CR 427
Scope: THIS PROJECT WILL PROVIDE INTERSECTION IMPROVEMENTS TO THIS URBAN SECTION OF ROADWAY AT CENTRAL FLA PKWY AND CR 427. PROJECT WILL INCLUDE RIGHT OF WAY ACQUISITION, WIDENING, RESURFACING, MAST ARM SIGNALS. THE APPROXIMATE LENGTH OF THE PROJECT IS 1.0 MILES. PRELIMINARY ENGINEERING STUDY UNDERWAY TO DETERMINE FINAL DESIGN ALTERNATIVE AS WELL AS ROW AND CONSTRUCTION COSTS. STUDY WILL BE SPLIT INTO TWO PARTS ONE FOR EACH INTERSECTION (CENTRAL FLA PARKWAY AND CR 426)
FLORIDA DEPARTMENT OF TRANSPORTATION
ANTICIPATED AGREEMENT
Phases:
Design Start: 8/2008 End: 8/2010 Road Construction Start: 6/2013 End: 6/2015
|
|
SR 434 SEDIMENT BASIN LITTLE WEKIVA RIVER DRAINAGE
Project Type: Stormwater
Project Manager:
Robert Walter - 407-665-5753
Status: Active
From: SR 434
To: AT LITTLE WEKIVA RIVER
Scope: DESIGN OF A SEDIMENT COLLECTION BASIN ALONG THE LITTLE WEKIVA RIVER. PART OF A COMPREHENSIVE EROSION AND SEDIMENT CONTROL PLAN.
ST JOHNS RIVER WATER MANAGEMENT DISTRICT
AGREEMENT # SI440AA
THIS PROJECT WAS PART OF AN ORIGINAL AGREEMENT WHICH INCLUDED FOUR OTHER PROJECTS (WEATHERSFIELD, SAN SEBASTIAN, NORTHWESTERN, AND HORSELOVERS LANE). UNDER THAT AGREEMENT THIS PROJECT INCURRED $71,948 IN EXPENDITURES THAT WERE REIMBURSED ACROSS FY 01 - 02 AND FY 02 - 03. ONLY PROJECT EXPENDITURES BEGINNING WITH FY 05 - 06 WILL BE ELIGIBLE FOR REIMBURSEMENT UNDER AGREEMENT SI440AA.
Phases:
Design Start: 5/2007 End: 10/2009 Construction Start: 11/2009 End: 5/2010
|
|
SR 434 SIX LANING I-4 TO RANGELINE
Project Type: Roadway Projects
Project Manager:
Shad Smith - 407-665-5707
Status: Active
From: I - 4
To: RANGELINE RD
Scope: THIS PROJECT WILL WIDEN URBAN ROADWAY SECTION FROM 4 TO 6 LANES. THE PROJECT LENGTH IS APPROXIMATELY 1.7 MILES.
FLORIDA DEPARTMENT OF TRANSPORTATION
ANTICIPATED AGREEMENT
Phases:
Design Start: 2/2006 End: 9/2010 Land Start: 8/2008 End: 9/2010 Road Construction Start: 7/2013 End: 4/2015
|
|
SR 434 SIX LANING WIDEN FROM 4 TO 6 LANES
Project Type: Roadway Projects
Project Manager:
Brett Blackadar - 407-665-5702
Status: Active
From: MONTGOMERY RD
To: I-4
Scope: WIDEN URBAN ROADWAY SECTION FROM 4 TO 6 LANES AND REPLACE BRIDGE OVER THE LITTLE WEKIVA RIVER. THE PROJECT LENGTH IS APPROXIMATELY 1.0 MILES
FLORIDA DEPARTMENT OF TRANSPORTATION
AGREEMENT # AP447
Phases:
Design Start: 6/2004 End: 8/2007 Land Start: 11/2006 End: 6/2008 Construction Start: 3/2009 End: 5/2010 Road Construction Start: 3/2009 End: 4/2010
|
|
SR 436 AT RED BUG LAKE RD INTERCHANGE
Project Type: Roadway Projects
Project Manager:
Shad Smith - 407-665-5707
Status: Active
From: WILSHIRE BLVD
To: LAKE HOWELL RD.
Scope: THIS PROJECT WILL CREATE A PARTIAL INTERCHANGE AT SR 436 AND RED BUG LAKE RD THAT WILL INCLUDE A FLYOVER FOR SOUTHBOUND VEHICLES ON SR 436 TURNING ONTO EASTBOUND RED BUG LAKE RD. THE PROJECT WILL ALSO INCLUDE WIDENING PORTION OF RED BUG LAKE RD AND SR 436.
MORE SPECIFIC PROJECT INFORMATION CAN BE FOUND AT THE FOLLOWING WEBSITE
65.202.76.58/
FLORIDA DEPARTMENT OF TRANSPORTATION AGREEMENT # 419369-1
FLORIDA DEPARTMENT OF TRANSPORTATION
ADDITIONAL ANTICIPATED AGREEMENT
ACCORDING TO AN EMAIL FROM BRETT BLACKADAR DATED 04/22/09 THERE WILL BE AN AGREEMENT WITH THE CITY OF CASSELBERRY TO MAINTAIN ALL OF THE PONDS AND THE LANDSCAPING IN THE MEDIANS ON ALL ROADS AFTER CONSTRUCTION IS COMPLETE. SR 436 AND THE ADJACENT PONDS WILL BE OWNED BY FDOT AND FOR RED BUG LAKE RD THE ADJACENT PONDS WILL BE OWNED BY SEMINOLE COUNTY.
Phases:
Design Start: 9/2003 End: 8/2008 Land Start: 3/2008 End: 2/2010 Road Construction Start: 1/2011 End: 7/2013
|