| Downloads |
Report Descriptions |
| Save these files to your computer: Right mouse click on the link and Choose 'Save As' |
|
|
Lockhart-Smith Canal, Monroe Basin Engineering Study and Drainage Inventory
Prepared by: Singhofen & Associates, Inc.
September 1992
|
|
|
Feasibility Study of Waste Tire Use in Pollution Control for Stormwater Management and Water Conservation in Florida
Prepared by: Stormwater Management Academy, University of Central Florida.
September 2008
|
|
|
Summary Memorandum Snow Hill Road-Jacobs Trail Outfall Improvement Project
Prepared by: Singhofen & Associates, Inc.
September 9, 2008
|
|
|
Wekiva Parkway & Protection Act
Prepared by: Camp, Dresser & McKee, Inc.
November 2005 |
|
|
Big Wekiva Basin Study and Drainage Inventory
Prepared by: Dyer, Riddle, Mills & Precourt, Inc.
September, 2000
|
|
|
Monroe Basin Engineering Study
Prepared by: Camp, Dresser & McKee Inc.
February 2002
adlCPR ver. 2.20 |
|
|
Lake Jesup Basin Engineering Study and Drainage Inventory
Prepared by: Camp, Dresser & McKee Inc.
December 2001 |
|
|
Little Econlockhatchee River Basin
Prepared by: Singhofen & Associates, Inc
May 2001 |
|
|
Midway Basin
Prepared by: Lochrane Engineering, Inc.
September 1997 |
|
|
Little Lake Howell Basin
Prepared by: Gee and Jenson
May 1997 |
|
|
Soldier's Creek Basin
Prepared by: Singhofen & Associates, Inc
December 1996 |
|
|
Gee Creek Basin
Prepared by: Singhofen & Associates, Inc
December 1996 |
|
|
Little Wekiva Basin
Prepared by: Camp, Dresser & McKee, Inc.
November 2005 |
|
|
Howell Creek Basin Water Management Plan
Prepared by: Camp, Dresser and McKee, Inc.
April 2011 |
|
|
Howell Creek Basin Water Management
Plan Part I : System Inventory
Plan Part II : Engineering Analysis
Prepared by: Camp, Dresser and McKee, Inc.
May 2007
|
| |
|
|
Drainage Inventory Files
|
 |
|
|
Howell Creek Basin Drainage Inventory Engineering Study
Prepared by: Dyer, Riddle, Mills & Precourt, Inc.
February 1994
adICPR ver. 1.4 |
|
|
Howell Creek Assessment-Lake Howell Rd to SR 436
Prepared by: Inwood Consulting Engineers.
February 2010
|
|
|
Cassel Creek Projects
Prepared by: BCI Engineers & Scientists, Inc
June 2005 |
|
|
Aloma Woods Drainage Basin Study
Prepared by: Professional Engineering Consultants, Inc.
July, 2004 |
|
|
Aloma Woods Outfall Assessment
Prepared by: Inwood Consulting Engineers
June, 2010 |
|
|
|
Summary Preliminary Engineering Report for Stormwater Management Facilities Mill Creek/Cloud Branch City of Sanford, Florida
Prepared by: Conklin, Porter & Holmes Engineers, Inc.
July 1992 |
|
|
Stormwater Management Study
pared by: Post, Buckley, Schuh & Jernigan Inc
June 1989 |
|
|
Mill Creek / Cloud Branch Drainage Study, City of Sanford, Florida
Prepared by: Conklin, Porter & Holmes Engineers, Inc.
April 1988 |