Improvements are generally installed within the roadway right-of-way or other utility easement. The Preliminary Engineering Study will define the required easement area. However, in general, water mains shall be located in unpaved areas within dedicated rights-of-way or utility easements. All water mains located outside of dedicated rights-of-way shall require a minimum 15 foot easement. Additional easement widths shall be required when the pipe size or depth of cover so dictates. Generally, water mains shall not be installed in or under retention ponds, wetlands, drainage swales, or other structures or along side or rear lot lines unless approved by the Manager or the serving utility. All easement areas are required to be cleared of any and all obstructions prior to the commencement of construction activities. |